Quantity Surveying & Valuation 6th Sem/Civil/Dec 2017 Diploma Question Paper

                                      SECTION-A

Q1. a) Fill in the Blanks.                                             15×1=15 

    a. Units of measurement of brick wall is __________________
    b. No. Of brick in 1cum of brick masonry is _____________________
    c. Bar bending schedule is made to find out quantity of ____________________
    d. Dry material required for 1cum of cement concrete is________ cum
    e. The livable area of a building at any floor is called ________________

b) State the unit of measurement for the following.

    f. Dpc
    g. Plastering
    h. Concrete flooring
     i. Painting
     j. Erthwork
    k. Cement concrete
     l. Wood work in door frames
    m. Railing
     n. Brick work in foundation
     o. Ashlar masonary

                                      SECTION-B

Q2. Attempt any five questions.                                                                    5×6=30   
  a. What is rough cost estimate?
  b. Write a short note on depreciation
  c. Find out the dry material required for 10 cum cement concrete 1:2:4
  d. Write a short note on sinking fund.
  e. What is lump slump contract
  f. What do you understand by specification of works
  g. Write a short note on Role of contractor.
  h. What do you know about Tender form?

                                     SECTION-C

Q3. Attempt any three questions.                                                       3×10=30

   Q3 Find out material for Brick flooring 10 cm thick laid in cement mortar 1:5 over 10 cm thick cement concrete 1:6:18 over 10 cm sand filling.
   Q4. What is contract, Explain different types of contract?
   Q5. A part of road is to be constructed at a uniform rising gradient of 1 in 30. The NS levels are as follows

 

 

If the formation level at RD0 is 60m, Estimate the quantity of earth work for formation width of 10m. The site slope is 1:2 (Vertical: Horizontal) and there is no cross slope.
   Q6. Workout the quantities of the following items from the given drawing :
   (i) Earthwork in excavation.
  (ii) First class brick work in cement mortar in foundation and plinth.
   (iii) 2.5 cm cement concrete DPC
   (iv) Fist class brick work in cement mortar 1:6 in super structure.

Quantity Surveying & Valuation 6th Sem/Civil/ dEC 2017 Paper

Get Started

Section a applied Mechanics 3rd Sem/Civil/dec 2017 Diploma Solved Question Paper

Units of measurement of brick wall is __________________ No. Of brick in 1cum of brick masonry is _______________  Bar bending schedule is made to find out quantity of ____________________ Dry material required for 1cum of cement concrete is________ cum The livable area of a building at any floor is called ________________ State the unit of measurement for f. Dpc Give the unit of measurement for g. Plastering What are the unit of measurement for h. Concrete flooring State the unit of measurement for i. Painting Give the unit of measurement for  j. Erthwork State the unit of measurement for  k. Cement concrete Give the unit of measurement for  l. Wood work in door frames What are  the unit of measurement for m. Railing State the unit of measurement for  n. Brick work in foundation Give the unit of measurement for  o. Ashlar masonary
Quantity Surveying & Valuation 6th Sem/Civil/Dec 2017 Paper Click Here

Section B :Quantity Surveying & Valuation 6th Sem/Civil/dec\’17

What is rough cost estimate?

Rough cost estimate

Write a short note on depreciation

Short note on depreciation

Find out the dry material required for 10 cum cement concrete 1:2:4

Calculate the dry material required for 10 cum cement concrete 1:2:4

Write a short note on sinking fund.

Short note on sinking fund.

What is lump slump contract ?

Lump slump contract

What do you understand by specification of works ?

Specification of works 

Write a short note on Role of contractor.

Short note on Role of contractor.

What do you know about Tender form?

Tender form

Quantity Surveying & Valuation 6th Sem/Civil/DEC 2017 Diploma Solved Paper Click Here

Quantity Surveying & Valuation 6th Sem/Civil /DEC 2017 Diploma Paper

Get Started https://www.youtube.com/watch?v=UHX6f8TIvX8https://www.youtube.com/watch?v=M_RR6LVICp0https://www.youtube.com/watch?v=mV41CMWonN4https://www.youtube.com/watch?v=s0LVPE0Q3LE&list=PLA9Q9SDZ781WXNAWit379A4CRLMvjGiUw&index=14&t=0s

Section c :-Quantity Surveying & Valuation Civil/May 2019 Paper

Prepare a preliminary estimate of a building having plinth area equal to 2000 sq.m. Workout the analyses of rates per cu.m for Brick work 1:4 cement sand mortar in superstructure. Define an estimate. Give its importance or objectives. Name the various types of estimate.

Estimate and its importance or objectives

Name the various types of estimate.

What is contract? Explain the different type of contract.

Contract and different type of contract.

Quantity Surveying & Valuation 6th Sem/Civil/DEC 2017 Diploma Paper Contact Us
MY YOUTUBE CHANNEL
JK Smart Classes Upload Lecture for Degree classes like B.TECH,M.TECH in any stream like ECE,EE,ME and Civil Engineering \"JK JK SMART CLASSES ER.JASWINDER KUMAR \"JK JK SMART LECTURE ER.JASWINDER KUMAR Engineering Classes Upload Lecture for Polytechnic Diploma classes in any stream like ECE,EE,ME and Civil Engineering \"JK ENGINEERING CLASSES ER.JASWINDER KUMAR \"JK er.jaswinder kumar Senior Lecturer