81Â Â a. Units of measurement of brick wall is __________________
  f. Dpc
Q2. Attempt any five questions.                                  5×6=30 Â
  Q3 Find out material for Brick flooring 10 cm thick laid in cement mortar 1:5 over 10 cm thick cement concrete 1:6:18 over 10 cm sand filling.
If the formation level at RD0 is 60m, Estimate the quantity of earth work for formation width of 10m. The site slope is 1:2 (Vertical: Horizontal) and there is no cross slope.
Rough cost estimate
Write a short note on depreciation
Short note on depreciation
Find out the dry material required for 10 cum cement concrete 1:2:4
Calculate the dry material required for 10 cum cement concrete 1:2:4
Write a short note on sinking fund.
Short note on sinking fund.
What is lump slump contract ?
Lump slump contract
What do you understand by specification of works ?
Specification of worksÂ
Write a short note on Role of contractor.
Short note on Role of contractor.
What do you know about Tender form?
Name the various types of estimate.
What is contract? Explain the different type of contract.